Friday, August 22, 2014

The Permit Is Finaled,....Now What?

Now what indeed.
Now, we just simply have to actually finish the apartment.
Permit finaled and rent-outable are two different things.

Let me take you on a visual tour of the apartment as it is now.

Here is the view at the front door down the entrance hallway.

The hallway ends in the family room.
 That is not me in the picture.

Off the family room are two bedrooms.
The small bedroom.

The medium bedroom

The kitchen is also entered off the family room.

Check out those sweet counter tops. Ya some work to do here.
 The plywood is the base for the 'real' counter tops which HAVE to be granite....

Different angle of the kitchen showing the family room on the left.

Guest Bath
Yes, this one will look a lot better when its done also...

The dining room.

Off this doorway in the dining room is the master bedroom.

The master bedroom looking from the doorway into the dining room.

Different view of the master bedroom looking back at the door into the dinning
room/kitchen.

The entrance to the master closet.

Right inside the entrance looking right.

Little hallway in master closet to master bath.

Master Bath
 Don't worry its going to look a lot nicer when done.

Master bath from another view.
 I really like the lights over the sink.

This shot shows the back door out of the master bedroom.
The door on the right is.

The utility room.
 Love those copper pipes.

Walking past the utility room on the left is the laundry room for the entire building.
 Our tenants have free use of the laundry.

Here's something that's hard to see. The painters are smoothing out the
horrible, horrible texture on the walls. You can see on the left its smooth
and on the right its still the original texture.

Freaking Union Drywallers!!!
 The union drywallers screwed up on a lot of the boxes.
Just look at these...

This one bugs me the most. Really? were they even trying?
I totally screwed up and didn't look hard at all the box cut outs before I
paid them.....so now I'm paying the painters to fix the drywallers mistakes....

Does the apartment look like its ready to move in?
Heck No!

Still To Do
Oh, how I wish this list was shorter.
Install new counter top in kitchen.
Install the trim (its gotta be stained and finished first).
Install the flooring.
Install window coverings.
Figure out what the heck we're going to do in the master closet and do it.
Install new vanities/mirrors in bathrooms.
and probably a bunch of other stuff...

Thursday, August 21, 2014

We Got Our Permit Finaled!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

Woo-whoooooooooooooooooooooooooooooooooooooooooooooooooooooo!!!!!!!!!!!!!!
Man my back hurts.
Woo, I say, Woo!
Ouch, my back.
Break out the good Scotch, Whiskey, Bourbon, Tequila, etc....
Did I mention how much my back hurts?
Woooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooooooooooooooooooooooo!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
Owwwwwwww, make it stop hurting.
Here is what a finaled permit card looks like in the city of Alameda
If you don't think that this is going under glass on the wall to be very proudly displayed
you would be very mistaken.
Man, my back is just killing me.
Woooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
oooooooooooooooooooooooooooooooooo!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

Up Next?
Sleep? Ha, I wish..
 

Thursday, February 2, 2012

Foundation Information Overload!!!

I wish....

Went down to the building dept yesterday to try to find any documentation on the foundation redo here at Chez Neumansky 3.0.
Last time I went down, about six months ago, they didn't have anything for it! It was apparently lost in a nether world or something?

This time they had it scanned into the computer and the very, very nice people at the dept printed out what they had for me to look at.......

Behold the super detailed, high-tech document that got you a foundation permit in '01....

Yep, that's it....well, maybe not, but this was the only bit from the finaled foundation permit that was scanned in....so maybe there was more documentation originally and it got misplaced??? I doubt it....

No footing sections, no rebar schedule, no slab section...no nothing...
How, is this enough to get a permit for a foundation redo? Blows me away...

The city has minimum standards for foundations on their website.
http://www.cityofalamedaca.gov/getdoc.cfm?id=168

Lets just hope that with it being inspected and approved by a city inspector that we got at least the 2 story foundation..though I am hoping that its the 3-story version.

Crazy right? The most important thing holding this house up and this is all the docs the city has kept on it....