We are realizing that he have to step up our time table for remodeling-restoring our house. We can't afford to have it go on for-ever. The first step in having a project not go on forever is of course to have a well thought out overall plan......we don't have one of those yet really...so we could use a lot of help. Please see the illustrations and notes below.
If we use one of your ideas you will receive a super-fabulous Chez Neumansky themed prize!
Here's the first floor of our house. We have to call it 'unit A' cause the city considers the house a tri-plex with each level being a separate unit. So, the bottom floor is Unit A the middle floor is Unit B and the top floor is Unit C.
<- Here's the bottom floor. This is the floor we just reconfigured when we re-did the foundation. This floor is pretty set in stone at this point but we are open for ideas on how to get an interior stair up to the 2nd level. This pic shows a spiral stair in the laundry area but we are not married to that idea, that's just the best idea we could come up with...

<-Here's the middle floor of the house. Here we need major help in the kitchen area. We need to figure out how to fit everything in there. We need it to be an eat-in kitchen also and fit a 5'by3' table. We are not against moving-changing windows-walls-doors to make the kitchen work.
We also need to figure out how to get a stair down to the bottom level with out totally screwing up the flow and original character of the house. The kitchen and sun porch have already been stripped of any original details, those rooms can be changed the most. The Front two rooms and bedroom are original and we are loath to mess with them too much.
<- Here's the top floor of the house. Remember we gutted this floor in the de-stankification of the house. This shows our proposed idea for a bathroom but we are open to new ideas. Basically, we want the top floor to function as our 'master bedroom retreat' (man I sound like I am trying to sell a house in Danville). To us that means a bedroom, an office-den, a bathroom and lots of storage.
Irene does not like the set-up shown above because when one person gets up way earlier than the other they have to walk over to the closet area, then walk back over across the bedroom to get to the bathroom. She thinks that it will be impossible to not piss off the person still trying to sleep....since that person is usually me she might be right....
So that's it we would appreciate any useful suggestions that y'all have. If you are really interested I have pdfs of the floors above also but I can't figure out how to put them on the blog for downloading? If you would like the pdf versions please send me an email and I'll mail 'em right out to ya.