Thursday, December 20, 2007

One more day till our house has feet

The rain is supposed to be over until the end of next week, so our little lean-to tent has gone away. Over on the East side of the house you can see that everything is pretty much ready to be filled with concrete.

The inspector was by yesterday, and he liked everything he saw. He needs to come again before the pour to inspect the plumbing and the final forms, but it seems like we're good to go for getting a foundation tomorrow!


Here's a nice illustration of how fast these guys are working. This is where the gas line comes into the house. On the left is after day 11, on the right is the next day. Once the outside piece of plywood goes up it's hard to see the rebar inside




















And here's the footing for the post which will hold up the beam which will hold up the whole middle of the house. On the left is after day 11, on the right is the next day with the post in place




















And a better view into the footing. The slab will be poured over the top, so we won't even know it's there.
















These are the sleeves for the plumbing lines into our new bathroom. The plumber had more to do today, which is one of the reasons the pour was delayed.












From this angle outside you can see most of the final structure of the forms, and all the bracing so the concrete can't push out.












This is our growing river, also known as the foundation for our load-bearing wall in the back of the house.









And finally, a view from the back. There's quite a lot going on down there.

Hopefully everything goes well tomorrow and we'll have something for the house to sit on!

Tuesday, December 18, 2007

Neither rain, nor sleet, nor snow can stop these guys

This is where we are at after only 10 working days!

This week has been full of rain, and it hasn't slowed the crew down one bit! Though the bottom of the footing trenches are getting kinda muddy...


<-- This is the form for the foundation wall on the West side of the house.

Notice that the foundation wall will be flush with the inside side of the joists. The grey sheet is the waterproofing membrane which lines the trench below ground level. You also can see the rebar which reinforces the concrete (it's right there in the name: reinforcing bar.. rebar.. get it?), and the anchor bolts which tie the house into the foundation.

That's the last picture taken before the rain hit..




This is what our back door looks like now. The waterfall off the corner is nice.








This will be the bearing wall in the back part of the house. The front workshop area will have a super-beefy post and beam to span the house and keep it nice and open.

The 2x6s here aren't the joists, they're just there to hold the sill plate up until the footing is poured. The foundation will be poured up to the bottom of these bottom plates then the slab will be poured giving us one level unbroken floor.

There's a nice river running through these trenches, but they'll bring a sump on Thursday to pump it out before pouring the concrete.






The front of the house is a slightly different obstacle course every day. The sidewalk is broken up for access to the sewer, and the intact part is of course taken up by the porta-potty. The nice 96 year old lady has been walking in the street on her way to visit her daughter.. I'd really like for her to be able to use the sidewalk again soon.

You may notice that one of the garage doors is missing.. it apparently came apart from the vibrations.

We haven't heard anything about the inspection yet, so I hope no news is good news. We'll find out in the morning..
We hope that everything goes as planned and they can pour the foundation walls this Thursday.

Sunday, December 16, 2007

the wait is finally over: first problem

What You Don't Want To See When Preparing To Pour A Driveway

A couple of things came up yesterday as the driveway was being dug down... because we lowered the level of the garage, the driveway has to slope down about 2 feet from the street-this extra depth uncovered a few surprises...

<-- Here you can see both the problems. At the bottom left is the main sewer lateral cutting diagonally through the driveway. The trenches are at the final depth, and the pipe was barely below the surface. The yellow hose on the right is the main gas line into the house, also very close to the surface and nowhere near where anyone thought it was: right in the middle of a footing.




In this picture you can see why we were surprised to find the gas line in the middle of the driveway ->>

The red circle at the upper left is the line into the gas meter.

The blue circle is apparently the original gas line, right where we expected to find it, but capped off and not connected to anything.

Yellow on the right is the active gas line, about a foot into the driveway.




George the GC (in the Raiders jacket-go Raiders!!!) came over and we spent some time measuring and talking about the problems.


The sewer line will definitely need to be moved, but that was less of a surprise. It'll run along the side of driveway under the water main (Apparently the sewer line can be as close as a foot away from the water line), but then it needs to make about a 60 degree bend (this seems like a likely clog point) to meet up with the city line.

Also, because of the new lower floor level and the fall requirement the fixtures in the bathroom will be higher than the floor.. we're just trying to determine how high.

Here's Hector (the head of the crew) measuring the height of the stack and where it connects to the city line, which is the absolute lowest it could be connected.

The gas line is a different issue.. from what everyone tells us it's very unlikely we'll be able to move it. All we need is a few inches to get it out of the driveway, but that would likely add weeks and a few thousand dollars to the project.

We are going to have to alter the retaining wall on the side of the driveway to skirt the gas line. This is going to squeeze the width of the driveway somewhat. To determine what the absolute minimum the driveway width can be, we pulled up my bike next to the car and got to measuring ourselves.. all we need is to be able to have a car parked in the driveway with enough room left over to get a motorcycle into and out of the garage. Dan's bike is a little wider than mine, but we think if the narrowest part of the driveway is 10' (and the car is parked as far to one side as we can manage) we should be ok.

I've got piles of pictures of the footing forms and framing thus far, I'll get that up tomorrow.

Saturday, December 15, 2007

These guys WORK

Work started right on schedule this morning at 9:00. I haven't actually gone down yet today (can't seem to bring myself to move more than 6" away from a space heater or the 2 cats sleeping on my legs..), but will get a good photo-roundup of today's progress to post tomorrow.

Plenty of progress in the last 2 days though!

Here's the side of the house as it looked Thursday morning.

The giant pile of dirt is gone, and the new joists and sill are in place on this side.

The pile of plywood visible inside isn't holding anything up, it's about to become the form for the concrete. Plus, it makes a handy step as it's a pretty big drop to get down there now! We haven't spent as much time down there this week, since the water heater pilot has thankfully stayed on.

Still plenty of dirt being pulled out. We expected them to bring a bobcat down there, but with all the cribbing they said it wouldn't be worthwhile, so it's all being dug by hand and loaded in the truck in wheelbarrows.



Lots of supplies showing up, too. Here's the Handy Rebar truck dropping off.. well, handy rebar! I think it's extra handy because it's pre-tied.




There's a pile of handy concrete spacers




and a pile of Paraseal waterproofing membrane.





Here's a shot of our slightly jenky, but no longer leaking or stopped up with a shoprag main sewage line. (the new joists and sill plate are visible here too)


Most of the drain lines are in a pile out back, which is fine for now since we only have 1 bathroom and the kitchen sink.


This is the temporary drain line for the kitchen sink that you can see tied in on the left of the main line.


The center area down there doesn't look too different, as most of the work is focused around the perimeter. Which you can see here, in the same view of the side taken Friday morning.

Most of the plywood form is in place, as are the supports.



The rebar cage all along the East side is in place, and the anchor bolts and tie-downs look to be in place all the way around the perimeter as of Friday morning. They're spaced even closer than what the engineer spec'd, so once there's a foundation there, this house is not coming off of it!

Until then though, it's a pretty wild ride. In the evenings, either of us walking through the house causes some pretty good swaying.. and being in here while the work is actually happening is like one earthquake after another.

I think it's about time I head out and grab the paper and some pictures, which I'll post tomorrow.

Tuesday, December 11, 2007

it's beginning to smell a lot like..

Festivus!!

Let me start off by warning you.. we're dorks, we know this

..but when you've got an outhouse on your front lawn, and the neighborhood starts twinkling with xmas lights.. well, you've just gotta do what you gotta do..

.. and we had to decorate the porta-potty!!


We got all bundled up, spiked some hot chocolate with something to keep us warm, and headed outside.






Dan took care of tinseling the sign










While I strung lights and hung the wreath (eucalyptus, so it smells nice!)











Then we hung a Santa's Workshop sign and stuck candy canes all over the place!



Happy Holidays

love,
the Neumanskys!!

Monday, December 10, 2007

This Remodel Brought To You BY...

Monster Energy Drink!
I don't like to think that we are overly picky but....
I think I know how these guys are getting the job done so fast. They're all hopped up on Monster Energy drink.
Look here's one hanging out with his buddy empty soda cup.
And here's one...
This one's hiding in the cribing.
This ones hanging out on some other cribing with its buddys coke one and coke two.
This one's taking a bow.




These two are getting crushed by the junk pile!! Poor things, won't someone save them?
Here's a long shot of the dig-out so far. If you look carefully you can see Mr. Monster and his buddy Coke lounging about on some cribbing.
I was so shocked at just how deep the hole was that they dug that I had to measure it. Its just about 9' which is how high we wanted the ceilings on the bottom story.
Here's Irene grabbing the 'good bricks' and hiding them so she can use them on the driveway and maybe on some garden paths and what-not.



But seriously, the job is coming along faster than I could of imagined. The house movers are coming this Wednesday to level the house and the plan is to be pouring the foundation walls the following wednesday!! Yahoo!!!! Good news too, its not supposed to rain for a couple of weeks!!

Sunday, December 9, 2007

Day 4, coming right along..

There has been a LOT of activity the last couple days!

You can see that the bottom run of our front stairs is gone.. I didn't think they would survive the work anyway, but the crew needed egress to run the giant steel beams under that side of the house. Half of them went in through the garage doors, and they're sitting on top of the stacks of railroad ties. There are clearer pictures of that from the inside.

With the stairs gone the no access to our front porch doesn't matter so much.. There were concerns about the load of the area over the porch, so it's shored up for the duration.




A close up of our front stairs.

We're going to need to rebuild that landing too.. I'll be very excited when we have a nice, sturdy staircase that we don't have to worry about buckling under people.

Look, no more animal nests anywhere under the house! or, hopefully, anywhere in the house for that matter!









Here a view from where the back door used to be. There's no wall back there at all - it's completely open.

This view illustrates the process a little.. The railroad ties (mostly 6"x6", but some 6"x8") were stacked in the bottom of the big pits. They're crisscrossed all the way up to the joists above. In this case, the steel beams run across the top of the stacks, and the house rests above that. Then the old foundation gets knocked out, and the rest of dirt is dug down to the level of the pits. There's still a bit more to be cleared out - that's why they were working on Saturday - but it's amazing how much was done in just 4 days!


The house is entirely resting on the railroad ties. You can see the walls just hanging there above the ground. So it's not that the house is being "lifted" to get the old foundation out and then rested back down on the new foundation (I've been asked about this a lot) - it's held exactly in place the whole time.



This coming week there will be some leveling done, so we expect to get some cracking. The back 4 feet of the house seems to have started life as a multi-level porch, which always had a slope. There's been further settling, which they're going to bring as close to level with the rest of the house as possible.

We've discovered some impressive cracks already radiating out from the corners of the pocket doors.






The back stairs are pretty interesting too.. I think they would've been rendered inaccessible yesterday, except that that's currently the only way in or out of the house. It looks like the weight of the deck is being spread across 4 2"x6"s which are resting on 2 of the steel beams. It looks pretty odd to us, but these guys are the experts.




Here's a view from the underside. There used to be a couple concrete piers with posts supporting the center of the deck, but the new outer wall of the house will replace some, and the remaining 2 will be redone.




We did notice this after yesterday's work.. the main sewer stack underneath the bathroom has a gaping hole in it. There's an obvious flow of water in the dirt around it, and it smells about as nice as you'd expect.

The neighbors weren't very excited about the work continuing on Saturday, but everyone is being very nice about it. Plus, we've been told by several people how friendly and respectful the crew has been. I'm glad we're surrounded by such nice people, because we have another 5 1/2 weeks to go!