Sunday, December 9, 2007

Day 4, coming right along..

There has been a LOT of activity the last couple days!

You can see that the bottom run of our front stairs is gone.. I didn't think they would survive the work anyway, but the crew needed egress to run the giant steel beams under that side of the house. Half of them went in through the garage doors, and they're sitting on top of the stacks of railroad ties. There are clearer pictures of that from the inside.

With the stairs gone the no access to our front porch doesn't matter so much.. There were concerns about the load of the area over the porch, so it's shored up for the duration.




A close up of our front stairs.

We're going to need to rebuild that landing too.. I'll be very excited when we have a nice, sturdy staircase that we don't have to worry about buckling under people.

Look, no more animal nests anywhere under the house! or, hopefully, anywhere in the house for that matter!









Here a view from where the back door used to be. There's no wall back there at all - it's completely open.

This view illustrates the process a little.. The railroad ties (mostly 6"x6", but some 6"x8") were stacked in the bottom of the big pits. They're crisscrossed all the way up to the joists above. In this case, the steel beams run across the top of the stacks, and the house rests above that. Then the old foundation gets knocked out, and the rest of dirt is dug down to the level of the pits. There's still a bit more to be cleared out - that's why they were working on Saturday - but it's amazing how much was done in just 4 days!


The house is entirely resting on the railroad ties. You can see the walls just hanging there above the ground. So it's not that the house is being "lifted" to get the old foundation out and then rested back down on the new foundation (I've been asked about this a lot) - it's held exactly in place the whole time.



This coming week there will be some leveling done, so we expect to get some cracking. The back 4 feet of the house seems to have started life as a multi-level porch, which always had a slope. There's been further settling, which they're going to bring as close to level with the rest of the house as possible.

We've discovered some impressive cracks already radiating out from the corners of the pocket doors.






The back stairs are pretty interesting too.. I think they would've been rendered inaccessible yesterday, except that that's currently the only way in or out of the house. It looks like the weight of the deck is being spread across 4 2"x6"s which are resting on 2 of the steel beams. It looks pretty odd to us, but these guys are the experts.




Here's a view from the underside. There used to be a couple concrete piers with posts supporting the center of the deck, but the new outer wall of the house will replace some, and the remaining 2 will be redone.




We did notice this after yesterday's work.. the main sewer stack underneath the bathroom has a gaping hole in it. There's an obvious flow of water in the dirt around it, and it smells about as nice as you'd expect.

The neighbors weren't very excited about the work continuing on Saturday, but everyone is being very nice about it. Plus, we've been told by several people how friendly and respectful the crew has been. I'm glad we're surrounded by such nice people, because we have another 5 1/2 weeks to go!

Friday, December 7, 2007

Out with the old..




These guys are moving really fast! This is what the basement looked like after day one ->










<- And here's the same spot after day 2!


Those pits are pretty scary when you come home in the dark and walk right past all the caution tape, using your cell phone as a flashlight.. Railroad ties are going to be stacked up in there to support the joists above so the old brick foundation can be knocked out



Because we timed it so well the crew has been working in the rain and mud, so they put up a tarp/shade to keep the lumber dry


The only weird thing so far (aside from the fact that the pilot on the water heater has been out..) is this framing under under that back room.


Here's a better picture of it. ->

I think those joists are being entirely replaced with ones that span all the way across - the open area back there is being closed in (the "major design review" portion of the plan).

In any case, when I asked about it I was told it was only temporary, which is fine with me.





When I left for work this morning they were loading in the steel beams which are going to carry the load of the house. You should've seen the crane maneuvering around those wires!


They put a roller on top of a railroad tie under each end of the beam which the crane placed them on so the beams can be moved by mere mortals.

You can also see the stack of railroad ties that was being loaded in.


After the first night of stumbling around in the dark I learned that trying to take pictures at the end of the day after getting home from wasn't really worth it, so I've been taking pix in the morning before heading out. I thought I'd do a complete spread of where things are tomorrow, but they've asked to work (on Saturday!) to get a bit more done. Much as we wanted a little extra sleep tomorrow morning, I don't want to put a damper on that kind of enthusiasm!

Wednesday, December 5, 2007

the sweet, sweet sounds of jackhammers in the morning




The gang's all here!




The crew showed up early and talked about the plans.





Then, at 8:05 (we have a clause in our contract that no loud work can start before 8am.. trying to make it a little less miserable for the neighbors) this gentleman got started! This right here is the very first cut towards our shiny new foundation!

Tuesday, December 4, 2007

Here we go!!!

Look what I just found when I came home from work! The porta-potty fairy was here!

Tomorrow morning, bright and early, the foundation work starts.
For real.
We're really starting!

We wrote letters to all the neighbors telling them what was going on and how to contact us.. hopefully the noise won't be too bad. Fortunately there's rain to keep the dust down (she says ironically, because this is the EXACT time of year we didn't want to be doing this and it did actually rain today.)

So, in about a year, please remind me of how happy I am now to be getting down to work :)

Thursday, November 29, 2007

Update on Kitchen Bump Out Idea

Just got back from the planning dept and running the kitchen bump-out idea past them. Surprise, surprise they didn't totally stomp all over it. They did say I could maximize my chances of getting it approved if I matched the outline of the existing bump-out (big shocker there). They also said that because its on a second floor that that will automatically trigger another major design review!!!! Yay!!!!! That means another ridiculous round of ridiculousness!!! And fee's!!!! Lots more fee's!! We are not planning on doing this anytime soon really I just wanted to get a feel from the city if I had an ice cubes chance in heck with the idea or not.

Here's the kicker, since our house is considered by the city to have significant historical value they are going to get the Alameda Architectural Preservation societies input into the project! That's going to suck....those guys are very, very particular about any changes being made to the Victorians of the island. I got the presidents name and number so I think I'll give him a call and see if I can sweet talk him into coming out to look at the house and giving me his input.

Another reason why I went down there was to put my contractors name on the permit as the GC. For some reason I thought it was required but the permit tech said it was not. I'm torn about this I don't want to be the GC as I believe that would make me responsible for everything that goes wrong. I'm paying Alameda Structural for that, I want them to be the GC and handle all this stuff. Is that crazy? Am I wrong about that?
Anywho, couldn't do it anyways as the contractor needs to be there to sign the forms.

Sunday, November 25, 2007

A Four Day Weekend And We Worked One Day!

No More Rats Nests--No More Rats Nests!!!
We know we've probably said this before but this time its for real!!! We got the last rats nest in the house today!!!!! Hurray!!!!! Yippee!!!! Huzzah!!!

Here's me preparing to do battle with the last nasty stinky, skanky, funky rats nest.
You see when we were researching the bump-out idea we looked more closely at our existing bump-out. When we peered up into the joist bays this is what we found!!

Yes its that lovely, lovely thing we here at Chez Neumansky call....a dirty, disgusting, nasty, stanky rats nest!! If you look closely you can just make out the form of a mummified rat.
All the joist bays in the bump-out were full of this kind of luvin. Don't know how we missed it before. This area in the family room was the last remaining bit of stank in the house and we couldn't figure out where it was coming from...now we know.

Here's me sucking the luvin out of the joist bays.. the sound the vast amounts of rock hard rat poops made while being sucked up by the shop vac was not unlike a rainstik....ahhhh how relaxing...

Here's a nice clean shiny joist bay sans the nasty rat funk. This is before we doused the area with the oxidizing solution. We laid the solution on pretty thick and kinda stunk up the family room...sorry kitties!

Check this out. This is a big trash can mostly full with rats nest!! Yum, Yum Yum We're so glad that this part of the rehab is over.....yea right.





We also finally finished up the demo of the top floor!
Here's Irene going at the nails behind the bead-board in the old bathroom on the top floor.
We bought some 12" metal cutting demo blades for the the sawzall and boy did they come in handy here. We also bought some new batteries for the cordless tools and wow we think they lasted a lot longer than our old ones. We were trying a different technique of gently loosening the wood just enough to get the blade in behind it and cutting the nails from behind. We think that this way ended up being a lot faster than trying to do it all with cats-paws and we think it left the wood in better shape.

Here's Irene again attacking that bead-board. Let me tell you, whoever put that stuff up should be keel-hauled. They used framing nails to put it up!!!!
The bead-board used to cover all the walls and ceiling of the original bath-kitchen area. Actually some time in the past they plastered over the bead-board to make it look smooth!!! Then someone put up dry wall over that!! Yikes what a mess!!

Here's a shot of what used to be the bead-board ceiling. I had to lay on the floor to get this one....



We managed to save most of the wood paneling. Irene's tub here has the scrap in it. The wood was super dried out redwood so not splitting the tongues was hard. We're not sure where exactly in the new bath the bead-board will go but hopefully we will figure out someplace cool to make this work worthwhile.

So that's what we got accomplished on our one day of house work on a four day weekend. We both can't wait for the foundation work to start. We can now also call for an inspection for our demo permits, hmmm, I think we'll wait for the first foundation inspection and just kill two birds with one stone.

Tuesday, November 20, 2007

Foundation Update

We've got a start date!!
So here's where we stand with the foundation. We've interviewed 4 top quality local foundation contractors and we've decided to go with George with Alameda Structural. We had a couple of disagreements with a couple of the terms in the contract but we had a very civil meeting about it today and have resolved our differences. We have a start date of Dec 5th!!!!!! George says it should take about 6 weeks to complete the job. We are a little bit nervous about having this work done during the rainiest part of the year but Alameda Structural has allayed our fears and we are going for it!

Man I hope I don't have a saga unfold like our peeps at casa decrepit. This job is going to be the single most expensive thing we've ever done to a house (besides buying it) by like an order of magnitude....

Wish us luck and good weather everyone!