Tuesday, May 20, 2008

Kitchen Design Ideas part 6 million

Okay so our post asking for design help ideas went over like a lead balloon
We wanted to share with y'all where we are with the kitchen remodel ideas.
We've talked to several designers, a design-builder and we've got several more in the chamber ready to be interviewed.


Here's the exact existing layout of the room which will be our kitchen.
Now with dimensions!!! The big giant windows are great for morning light but they are a pain to plan around! That and the window on the south wall is to dang close to the corner.

Here's our best attempt so far at a realistic remodel. The whole bump-out idea from earlier was kinda quashed by reality....We managed to get a little bit more space in the kitchen by squeezing down the chimney chase by 6" and removing half of it. Now its an AV cabinet and a small chase to run wires to the top floor. This also freed up enough space for us to put a corner china cabinet in the spot. Now we have somewhere to put our fancy wedding china and glasses...if we can find them Notice also that the wall between the bedroom and kitchen has been pushed into the bedroom 21". By moving the walls we gained 30 sq ft not fabulous but not horrible either. It makes the bedroom smaller but we think still quite livable with the 10' ceilings. We still plan on recessing the fridge into the wall so that its flush with the counters. Along the back wall we also moved the existing window away from the wall to allow for a corner wall cabinet. We did a mirror image window and cabinet on this same wall. Now the stove is flanked by windows with a view to the backyard.









Here's a shot looking into the room from standing in front of the stove. You can see the china hutch in the newly made corner. That weird pattern on the ceiling is my attempt to make it look like a tin ceiling with my cheap-o home design program. Lots of counter and cabinet space here.









Here's the view from the sink looking to the left. Not sure about the glass door into the sunporch its just a thought. It is a 'sunporch' and we might want to let light in from that direction. This also shows the new window we added to match the existing window on this wall.











Here's the view from the table looking at the fridge side of the room. In this version the fridge and pantry cabs run all the way to the ceiling while the rest are just standard cabinets. One odd thing about this layout is the door to the bedroom is more in the kitchen than it was before.










Here's the view looking towards the sink and stove. Notice we brought the window away from the wall 2' and lowered it so that we can see out of it more easily.






Well that's it for now. We hope to be able to find a capable designer to see if they can come up with a better solution. Some questions we still have are;

  1. How much cabinet and counter space do we really need? Should all the wall cabinets go all the way to the ceiling to maximize storage?
  2. What the best place for the main sink and can we fit a prep sink in there somewhere? Do we even need a prep sink?

Thursday, May 15, 2008

Help! We need design help!

We are realizing that he have to step up our time table for remodeling-restoring our house. We can't afford to have it go on for-ever. The first step in having a project not go on forever is of course to have a well thought out overall plan......we don't have one of those yet really...so we could use a lot of help. Please see the illustrations and notes below.


If we use one of your ideas you will receive a super-fabulous Chez Neumansky themed prize!

Here's the first floor of our house. We have to call it 'unit A' cause the city considers the house a tri-plex with each level being a separate unit. So, the bottom floor is Unit A the middle floor is Unit B and the top floor is Unit C.


<- Here's the bottom floor. This is the floor we just reconfigured when we re-did the foundation. This floor is pretty set in stone at this point but we are open for ideas on how to get an interior stair up to the 2nd level. This pic shows a spiral stair in the laundry area but we are not married to that idea, that's just the best idea we could come up with...



<-Here's the middle floor of the house. Here we need major help in the kitchen area. We need to figure out how to fit everything in there. We need it to be an eat-in kitchen also and fit a 5'by3' table. We are not against moving-changing windows-walls-doors to make the kitchen work.
We also need to figure out how to get a stair down to the bottom level with out totally screwing up the flow and original character of the house. The kitchen and sun porch have already been stripped of any original details, those rooms can be changed the most. The Front two rooms and bedroom are original and we are loath to mess with them too much.


<- Here's the top floor of the house. Remember we gutted this floor in the de-stankification of the house. This shows our proposed idea for a bathroom but we are open to new ideas.
Basically, we want the top floor to function as our 'master bedroom retreat' (man I sound like I am trying to sell a house in Danville). To us that means a bedroom, an office-den, a bathroom and lots of storage.
Irene does not like the set-up shown above because when one person gets up way earlier than the other they have to walk over to the closet area, then walk back over across the bedroom to get to the bathroom. She thinks that it will be impossible to not piss off the person still trying to sleep....since that person is usually me she might be right....
So that's it we would appreciate any useful suggestions that y'all have. If you are really interested I have pdfs of the floors above also but I can't figure out how to put them on the blog for downloading? If you would like the pdf versions please send me an email and I'll mail 'em right out to ya.




Sunday, May 11, 2008

Up goes the Heat

All the parts for our 2nd floor heat came.. I'm bummed I didn't think about taking a picture when I got home from work to see 10 boxes busted open along the side of the house. Every single box was broken open, and several had their contents spilling out into the dirt. Yup, that would've been a good picture..

Basically, we need to staple these thin plates of aluminum, called thin fins up onto the underside of the floor. They have tracks that the tubing fits into, which hold it up and radiates the heat.


Sounds simple enough.. but here's a shot of the underside of the floor. See all those little pointy bits sticking down?? Those are nails. Lots and lots of nails. Which would hold the thin fin out from the floor and keep it from working nearly as well as it needs to. The aluminum needs to fit tightly against the floor to transfer the heat efficiently.
So all the nails need to be cut flush with the wood.

Wire nippers cut the nails, but they left little bits hanging out.


So Dan got to spend the entire day grinding nails.

Lots and lots of nails.

little nails

everywhere


The nails are coming down through the thin strip oak floors we have in the front two "formal" rooms of the house.


Meanwhile, on the other side of the house..

I was able to start stapling up the thin fins under the entryway and in the hallway. I drew out the outline in chalk (no need to heat under the walls or stairs) and fired up the air compressor.

We're supposed to use 16 gauge staples, but our staple gun can only handle 18 gauge.. so it was pretty hit or miss getting the staples to go in cleanly. I kept trying to find the one way to hold the gun so it would work every time.. but no luck. Much as I fought with that thing today, it was still waaay better than a hand powered staple gun






The tubing needs to be 8" on center, and we get 2 in each joist bay which will carry a loop of tubing.

I got through the entryway and most of the hallway today before I was ready to drop. Apparently it's been so long since we've done actual physical work on the house that we're total wimps again! (In our defense, I'm getting over a cold and Dan's coming down with it.. so we're not at our best.. but still, we've got to ramp back up the housework action!)




And Dan's still grinding away at those nails.. there are still a lot of nails. After 8 hours of grinding there's still a lot of evenings after work to go.

Sunday, April 20, 2008

the house, circa 1995

Our new neighbors across the street found a picture of our house in a cabinet.. take a look!

This is what our old neighbors had to look out at every day.. can you imagine?

I made my CSI attempt at beefing up the date at the bottom left (they make it look so easy!) The last digit is either a 5 or a 9, and since the digit before is definitely a 9 and it looks different, I'm going with 5.
So this picture was taken August 3, 1995

Aside from the layer of filth, there are a couple interesting things in this picture. The whole front stair is rotting out and the post which we just discovered is completely rotten isn't even there! That would mean it was put in when the stairs were rebuilt in 1996. We've just replaced the stairs, and we're going to need to replace that post this summer.

This reminds me.. we need to finish power-washing the house so it doesn't wind up looking like this again!

Saturday, April 12, 2008

all work and no... work..

Dan and I have both been spending so much time at work that we haven't had much time or energy left to work on the house.. In fact, I started this post 2 weeks ago and just now have a chance to finish it while Dan's off at work! yes, on a Saturday :(

Dan got the floor plans finished to get the heating plan designed, but now we have a decision to make.. On the 3rd floor - our someday master bedroom suite - we're going to carpet the floor, so were planning on installing radiators for heat. There are some fancy new-fangled ones that will work right off the same pex lines as the radiant in-floor heat, so that seemed like our best bet. As it turns out, we can put hydronic radiant under carpet but we'd have to figure out how to get it in there. The 2nd floor (which is where we're living) has finished ceilings, and the 3rd floor has a perfectly intact oak strip subfloor which we're definitely not tearing up. The ceilings in just about every room on the 2nd floor have an awful skip-trowel texture on them, and there would be no love lost in losing them. Plus, from what we were able to pull out from the edges above, the insulation between the floors probably still has some rats nests, which if we could, would be great to get out. The problem is, we're living here! tearing down the ceiling will be a giant mess, and if we'd realized that we'd need to do it before we moved in, it wouldn't've been so bad. Now, however, a shower of rat poop is a little harder to deal with.

We'll put in-floor radiant in the bathroom regardless of how we heat the bedroom and office. There's a 6" step down anyway, since it was originally a covered porch, and we have plenty of room to put warmboard down on top of the existing floor and still have headroom left for tile.

Our heating alternatives for the bedroom and office are:
  1. A radiator in each room, probably at the baseboard.

  2. Staple-up tubing from underneath, which would require tearing out the ceiling underneath. This is how we're heating the middle floor, but we have nice, exposed access for that. Plus, there would be more the heat would have to go through to get to the room because of the existing wood subfoor

  3. A warmboard-type subfloor laid above the existing subfloor, which would cause us to lose about 2" in height in the room
I'm a little unsure how effective radiant under a carpet would be anyway, so I'm investigating that first (if anyone has any experience with that, I'd LOVE to hear it!). We'd be limited to a fairly thin pad, because that is an extremely insulating layer, which we'd want to minimize. And I think we'd be a little limited in what kind of carpet we could use. So even after the actual work is done, regardless of if we put it in from above or below, the tradeoff would be thin carpet and invisible heat with no loss in floorspace, or thick, dig-your-toes-in carpet with radiators in the rooms.

It's a beautiful warm day, which makes it even harder to think about heating systems.. but it does mean I can open all the windows and get some fresh air circulating. And the reality of living in a house with exposed studs and indoor/outdoor carpet and throw rugs covering every possible inch of floor my bare feet will never touch, is that even after the thorough spring cleaning it's just about to get, it'll still look like it needs to be cleaned. Maybe instead I'll spend the day on our lovely patio snapping my fingers trying to have the house magically be done.

Sunday, March 23, 2008

Our first house-iversary!

That's right.. a whole year has passed since we bought Chez Neumansky! After closing up the very last gaping hole in the side of the house, I thought I'd spend some time outside on this gorgeous spring day and take stock of where we are.

From here, I can actually see a lot of our progress:

  • There's not a giant pile of trash or weeds filling the yard, the porch or the house.
  • The crumbling pile of bricks has been replaced by a modern, strong foundation.
  • The other, taller crumbling pile of bricks has reconfigured itself into a driveway (which I can sorta make out through through the open fabulously gorgeous garage door)
  • The back porch, which we had to duck under to get to the back door, is now 9' up, and the back door is in a brand new earthquake-resistant shear wall.
  • The ground floor, which had about 4 different levels - some of which were concrete, some dirt, some linoleum - none of which would conform to modern height requirements, is now a nice, flat, 9' tall rough space.
  • I can see the cleanout for the drainage, which runs all the way around the perimeter and under the slab to a sump pump, which has been doing a great job of keeping everything dry through this very rainy season.
  • The beginnings of our first floor are framed in: a bedroom, bathroom and hallway, and then our garage/workshop.
  • And finally, our awesome patio, which I'm sitting on writing this!
Now for the stuff you can't see from here:
  • The house is fit for human habitation. I won't go into too many details.. let's just say it's clean enough to shower, eat and breathe in, and if you missed the time when it wasn't, take a look here.
  • As I mentioned at the beginning, there are no more gaping holes in the side of the house - no more "walls" of tarp, no more 2' gaps at the bottom of the doors because we lowered the ground level.. Our doors should be here in another week or two, but until then, Dan made us some ghetto-fabulous plywood doors (you can see one in the pic above), which make a remarkable difference in how nice the house looks.. plus, we can actually leave a pair of pliers in the garage without worrying that there are 6 different holes in the house big enough for a person to get in.
  • The radiant heat for the first floor living area is embedded in the slab, and Dan's inside now finishing up the floorplans for the top 2 floors so the radiant plans for the rest of the house can be generated.
  • The main sewer line from the house to the street has been redone, which is a city requirement when a house is sold - we have another 25 years (once the plumber gets the papers into the city, that is) before we have to have it inspected again.
  • We have 200 sparkly amps of modern electrical service coming into the house, with a subpanel on each floor.
  • We have new front stairs that are not in danger of disintegrating under a person walking up them.
Looking at the plans for 2008, we're making pretty good progress. We still have 3 1/2 months before the anniversary of actually living here.. by that time we hope to have a functional bathroom downstairs, which means all the plumbing, wiring, and heat for the whole house has to be in place so we can close in some walls (as willing as our friends are to dive into anything for us, they still seem to be a little finicky about wanting walls around the bathroom.. go figure).

And here we are.. one year down, 65 to go!!

Wednesday, March 19, 2008

we've got the Power!

200 Amps of it!!

With 3 floors of living space, plus a workshop with a plasma cutter and welder, our rickety 100 amp service was not gonna cut it.. Plus, only the middle floor had anything resembling modern wiring, or working outlets for that matter.

We knew we needed to bring more power to the house, and since there was an existing subpanel on the middle floor already, it worked out very nicely to have a separate subpanel for each floor.

<-- Here's the subpanel in the garage/workshop.

Not sure if you can tell, but all the circuits are labeled correctly!! Ok, so there's only the one for the sump pump so far.. but it's very exciting that there's not a long list of wrong mappings to sort through, and since we'll write down each circuit as we run it, it'll always be right. For the rest of our lives!!! (if you don't think that's exciting, my explaining wouldn't help










<-- Here's the new main panel, with a shiny new meter too!

Now, if only that would stop spinning so fast we'd be in good shape. It's starting to warm up a little, and haven't had jackhammers running all month, so this was the first month our electric bill inched down a little.. but it's still waay higher than it should be. By next winter we'll have the radiant heat up and running, so all our space heaters can be retired and donated away. In the meantime, I stand by the decision that the our crazy electric bill is well worth tradeoff for not being able to see my breath in the bathroom in the morning.







Here's Dan framing in the roughout for the subpanel on the top floor -->













<-- And here's the subpanel for our master bedroom suite, aka the top floor.

It's kinda nice that when our bedroom and office are done, if we blow a circuit while say, both blow drying our hair and microwaving hot pockets in the bathroom, we won't have to go down one or two flights of stairs to reset it!

We tried to get a permit to start running the wiring and installing outlets and lights downstairs, but no luck. We need to work on the plans and try again.. maybe next week..