Sunday, September 21, 2008

Make way for PG&E

PG&E finally got us on the schedule to come and increase the gas service to the house. Because the gas main in the street is at low pressure, the only way to increase the pressure to the house is to increase the size of the line coming. If they'd gotten back to us 9 months ago our driveway could've been a foot and a half wider, but as it was we really didn't want to go with the suggestion to have an "accidental" gas leak to get them out before the foundation and slab were poured.

They told us the new meter wouldn't fit in the cabinet the existing one was in and we couldn't mount it outside that wall because we have stairs there now to get down to the newly-dug out garage. So, we had to find a new spot for the meter, and decided on the other side of the front stairs, next to the driveway.

The plan is to run the gas line straight (for a change) from the street, through the curb at the side of the driveway (seen in the picture at left), then up to a new meter.


So we needed to dig a trench from the gas main on the street, pull up the bricks along the edge of the driveway, and have a licensed plumber move the point of entry for the gas line into the house over to the new location.


<-- Here's me getting the dirt out from under the existing gas line. Doesn't it look fun?! Apparently Tom Sawyer's tactics don't work anymore because I tried to get 2 kids and a dog to help dig and none of them took me up on it!


And even if it wasn't almost October, we had to do something with all that misplaced dirt, right?!

The neighbors LOVE the memorial Dan made. (you probably need to click on the pic to get a version big enough to read)

Sunday, September 7, 2008

OT: Fire Lounge'n on the Playa

Welcome to the playa, let's get to work!

Trucking everything out to the middle of nowhere and setting it in its spot is just the beginning.. we had to fabricate all the runs of hose to get propane around the circle of fire fun. Then the hoses had to be trenched, along with the electric wires, deep enough so no one could snag them and pull them out.


Sound-activated fire sculpture requires sound, so that all had to be setup as well. A new friend donated those giant speakers and the cabinet all the equipment was in is the one old tv cabinet that Leroy's evil grandkids didn't steal from us after they broke into our house.

This is a very harsh environment, so everything has to be able to handle whatever mother nature can throw at it (often all on the same day!)

Here's our wedding arch, serving up its role as an entryway pretty nicely (if I do say so myself)

This must've been early in the night, because there was always a crowd huddled around the fire tornado - and the bar, for that matter!

Here we are in full swing

You can see the Thunderdome in the backgound off on the left.

Here's a little video (sorry about the crappy sound.. we had some.. um.. issues with the sound early and consistently through the event. You remember those ginormous speakers? blown in less than 5 minutes!)


A little later in the night and the pipes on the fire tornado are burning cherry red! (not sure why that looks fuchsia in every picture I took) Happily, if somewhat surprisingly, not a single drunk hippy tried to touch it!


Here's the tulips in their calm state. You can see the vines reaching up to the pilot flames that ignite the ball of propane


And here's a shot of the tulips in action.. can you see why we didn't test these in our driveway in Alameda?!

The controls for these were on a bar table next to the controls for the fire tornado and it was a lot of fun to see the handful of people who realized how they were being controlled realize that they could walk up and push the buttons.

Here's a shot from a tower (yes, we have towers) that gives a pretty good view of the lounge

We parked Steve (the tricycle at the upper left with the two tiki torch looking flames coming up out of skulls.. yeah, they shoot fire too. cute rings of flame) at the edge of the fire lounge for ambiance.



And finally, a video from above that hopefully lets you see what we were trying to do

Friday, August 22, 2008

Closing it up

The siding is starting to go up now, over the housewrap.. plus, you can see more of the waterproofing around the windows.

Our little transom (by which I mean the gaping hole left by lowering the door opening a couple feet) over the door is gone, the sheathing wraps around the corner and soon the waterproofing and siding will too.

hmm.. I really need to get the rest of that blue tape off the lites in the pretty door..


Next up is the flashing over the top of the windows to keep water from getting in between the siding and the trim.

And finally, the casing.

Although the only trim around the windows down here was 1x4s, we'll trim it out to match the built-up trim on the rest of the windows in the house.

For right now though, we're just happy to have windows!

Wednesday, August 20, 2008

We can see through the walls

Look, windows!

<-- Here are the windows in the garage

And back in the bedroom.. those are the only two openings in the wall! hen they're up we have a nice breeze, and - and here's the best part - when they're down, there's no breeze!




Back outside, you can see more of the waterproofing.. the housewrap adds a moisture barrier between the plywood and the siding, which is 2 layers of goodness we didn’t have before


Our house is a never-ending construction zone.. the piles move from one spot to another, but there are always piles.


Monday, August 18, 2008

WWW (Walls Windows Waterproofing)

We're pretty big on waterproofing anyway, because it increases the lifespan of the materials, but the fact that we had to cut off the bottom several inches of our house because the bottom of the studs was all rotted out is putting us on even more of a mission.

<-- Here you can see the flashing up to drive the water away from the bottom edge of the sheathing, out over the foundation


The sheathing and the flashing are up all the way along the length of the house

And the bumpout is freestanding again, still with no sag!

And here's a shot of the crazy and highly specific nailing pattern on the plywood sheathing. This wall adds an enormous amount of lateral bracing to the house which should (knock on wood) keep everything secure in an earthquake

Friday, August 15, 2008

reFraming

The bumpout is up on crutches, but it’s better and stronger than ever before! The jacks lifted it back inline, and the sag is gone


<-- Check out the underside.There's a new 2x10 sistered onto each joist from the edge of the bumpout through to the super-beefy beam running down the center of the garage.

It feels much more stable there too, walking and jumping on it from above. And soon we can get back to stapling up the heating fins so sometime this winter we have a chance of having heat. It'll be much easier to get the fins and tubing out under the bumpout with the underside exposed like this.

<-- These are those joists from the inside. You can see a bit of daylight coming through at the ends, and the sistered joists are resting on our super-beefy garage beam.

You can also see one set of window openings framed in with the new header and post.

Here’s a better view of the window framing in the garage/workshop.

The openings have new 6x6 headers, which are supported in the middle by 4x6 posts


This is the window framing in the bedroom in back.. there's actually wall back there now!

Which makes it reeeaally dark in there.. this pic is blindly taken with the flash. If only we had some windows..

Thursday, August 14, 2008

the Wall, continued

Here we have the beginning of the sheathing.

The windows you see there leaning up against the house are from the garage.. they don't match any other windows in the house and because they’re double-wides we had some problems with the framing that needed fixing.

From the inside a couple days ago you can see what the problem with the header is.. there isn't one! There's just a couple 2x6s turned on their side.. Not sure if you can see the sag in this picture, but it's pretty pronounced.

To span the opening over 2 windows with two stories above, we would have to put in a pretty beefy header, which would mean moving the windows down and buying new expensive beams. The alternative is to split up the windows and put a supporting post in between to support the header in the middle, which is what we decided to do.

Another issue we need to address is that the bumpout is underframed, and sagging even worse since the foundation was done. We figured it would be much better to deal with that now, before we closed up the walls. So we need to sister 2x10s to all the joists that cantilever out in the bumpout.

Here you can see the supports in place to prop it back up to level. Next, the joists can be attached nice and straight-like